CoastTec is the only APC-certified out-of-warranty service center for single-phase APC UPS and only R2: 2013 and RIOS certified company specializing in reuse and remanufacturing of APC UPS equipment. 2013 and RIOS certified company specializing in reuse and remanufacturing of APC UPS equipment. The APC SMT series Smart-UPS Tower 1500VA/1000W UPS with up to 7minutes runtime at full load is an advanced line interactive UPS system to protect network servers, storage and associated equipment. The UPS provides a clean and reliable network-grade power output, suitable for critical data and networking equipment. APC UPS 1500VA Battery Backup & Surge Protector, APC UPS BackUPS Pro (BX1500M). Buy Used and Save: Buy a Used 'APC BN1350G Battery Backup/Surge. Software available for download at APC website, USB cable, User manual. Smart UPS 1000 Calibration Cancels itself. The UPS doesn't have a NMC only a 232 com cable connected to the server to run the APC powershut software. Follow these steps to do a proper manual calibration on your APC UPS: 1. Battery must be at 100% capacity when the Runtime Calibration is initiated/started. For an APC UPS operating in APC smart protocol mode, apctest enables the reading. Refer to the detailed 'APC Smart Protocol' section in the apcupsd manual. Mode - this also depends on which cable is used to connect to the UPS.
Battery calibration can be performed by software, network management card, or manually. On the newer units (SUA, SMT) software calibration has become more accurate so you can give it a try. On older SU models, it’s best to do the manual hardware calibration. If you’re not getting the run time you thought you should have with the software method, perform a manual calibration to get a more accurate run time calculation.
![Apc Apc](https://s3-ap-southeast-1.amazonaws.com/easystore.co/12212/images/products/888851.jpeg)
Some people only do software calibration and consider that good enough, others prefer to do a manual calibration as a tried and true way of getting exact run time numbers. Neither is really wrong, it’s a matter of preference. Follow these steps to do a proper manual calibration on your APC UPS: 1. Battery must be at 100% capacity when the Runtime Calibration is initiated/started. (charge the UPS for 24hours prior) 2. The UPS must have 30-34% load on it during the calibration (Constant load, try: lamps, computers, monitors.
Calibration Apc Ups Software Utilized Examples
Measure load% by PowerChute) 3. Disconnect the serial/USB comm cable from the UPS (you don’t want PowerChute to shut down equipment) 4. The battery must be discharged completely (unplug UPS from wall outlet, let the UPS to shut off completely due to a discharged battery). Remove the attached load (ie – lights, computers) 6. Let the UPS charge for 8 hours while OFF (plug back into utility power, press OFF button when UPS turns ON) 7. Turn on UPS (run time should now be accurate) If you’re confused about this process or stuck on one of the steps, email us at or give us a call toll free at 866-311-1945. Filed Under: Tagged With:.